[1]
2024. Scheduling Analysis of Oil Tank Maintenance Project System Coil Heater Pipe Factory Using CPM Method (Critical Path Method) and PERT (Project Evaluation and Review Technique). INVEST : Jurnal Inovasi Bisnis dan Akuntansi. 5, 1 (apr. 2024), 102–107. DOI:https://doi.org/10.55583/invest.v5i1.634.