“Scheduling Analysis of Oil Tank Maintenance Project System Coil Heater Pipe Factory Using CPM Method (Critical Path Method) and PERT (Project Evaluation and Review Technique)” (2024) INVEST : Jurnal Inovasi Bisnis dan Akuntansi, 5(1), hlm. 102–107. doi:10.55583/invest.v5i1.634.