1.
Scheduling Analysis of Oil Tank Maintenance Project System Coil Heater Pipe Factory Using CPM Method (Critical Path Method) and PERT (Project Evaluation and Review Technique). INVEST. 2024;5(1):102-107. doi:10.55583/invest.v5i1.634