(1)
Scheduling Analysis of Oil Tank Maintenance Project System Coil Heater Pipe Factory Using CPM Method (Critical Path Method) and PERT (Project Evaluation and Review Technique). INVEST 2024, 5 (1), 102-107. https://doi.org/10.55583/invest.v5i1.634.